Image of the 100,000th pageview.... |

So, now we are back aboard and working on the mast rigging and cleaning and stowing every thing. Someday soon, we will be back to where we started, that being with a fully working perfect IP 35, just like we had in May when we ripped it all apart and trucked it to the factory!
The Current jobs are:
1. Install the mast
2. Install 3 sails
3. Install Bimini and Dodger and full enclosure
4. Wire up all antennas
5. Re-install SSB antenna and AT140 tuner
6. Wire up mast base connections for Radar, VHF, TV, B&G wind, lights
7. Change engine oil, clean engine room
8. Re-build alternator again with new parts improperly installed in Bahamas
9. Test radar and navigation system and GPS and AIS systems
10. Shake down and test drive train and all systems
Then, maybe then, we can move on and get cruising! Overall, we do not yet see the light at the end of the tunnel. We are simply working one day at a time, with no real schedule and no real place to be but here. Such is life on a cruising sailboat.